Traffic Impacts

 This map is provided to help residents plan for anticipated impacts when traveling on roadways maintained by the City of Oregon City.  Please know that emergencies, changing weather conditions and other incidents may result in last-minute changes to this schedule.

If the embedded map does not display properly, you can view it here.

RoadImpact
Molalla Ave: Warner Milne to BeavercreekConstruction of water pipe from new mainline across Molalla Avenue for future connection to hydrants, appurtenances and mainlines on side roads. Sept 8 - 18 7 a.m. - 4 p.m.
Beavercreek WayPotholing utilities; local access only. Sept. 8 - 9 7 a.m. to 4 p.m.


2025 Roadway Reconstruction PMUF Project (CI-24-006)

RoadImpact
Main St (99E to 6th)6th St (99E to Railroad)S. 2nd St.
New pavement on Main St. Night work happening the week of Sept. 14.


Rivercrest Phase 4

RoadImpact
Linn Ave. at the intersection of Eastfield Dr.Flagging between 9 AM and 3 PM to replace rejected concrete driveway approach onto Eastfield Dr. Expect delays and use alternative routes if possible. Sept. 12.
Eastfield Ln.

Full closure of Eastfield Ln between 9 AM and 3 PM to replace rejected concrete driveway approach from Linn Ave. Residents are advised to plan trips in and out of this neighborhood outside of closure hours as much as possible. Three temporary parking spaces along Linn Avenue just north of Eastfield Lane may been provided to impacted residents for temporary use while access to Eastfield Lane is limited if requested.

Residents should contact the City or Saunders (construction contractor) to request preparation of these spaces! Sept. 12.